This
project incorporates 40,000 GSF for a new arts facility
and a 13,000 GSF addition for the Lower School. The
arts facility includes a black box theatre, dance studio
and varied art, music, and theater facilities. The lower
school addition includes a number of new and renovated
classrooms along with other associated facilities. The
large program was broken down into smaller masses, which
engage and cascade down the sloped site. |